Residential-Project-2

ESTIMATE

We supply all labour

Client supply materials deliveries etc.

All work warranted for 1 year.

All work insured.

Terms: Payment will be divided after discussing with the client

Working hours: 8.00 am to 5.30 pm.

All work supervised by Pawel Raczkowski
Residential-Project-2--2

To :

Bedroom 1 : 4040 x 2040 = 8,24 m2 (walls , ceilings)

Store Room : 2520 x 1420 = 3,58m2

Corridor part 1 : 1900 x 1900 = 3,61 m2

Corridor part 2 ; 1000 x 3600 = 3,6 m2

Corridor part 3 ; 1000 x 1600 = 1,6m2 1702

Corridor part 4 ; 1000 x 2820 = 2,82 m2

Bathroom ; 2350 x 3560 = 8,36Residential-Project-2--1

Store Room 2 1000 x 1500 x 2 = 1,5 m2 x 2

Bedroom 2 : 3100 x 2820 = 8,74 m2

Extension Side ; 1350 2820 = 3,81 m2

Kitchen ; 5300 x 4200 = 22,26 m2

Rear Extension ; 3980 x 4260 = 16,95 m2

 

total : 82.96 m2 (90 m2)

Residential-Project-2--3

to ceiling : 3,5 m

 

Wood floor : 90 x 25 = 2250

1m2 = 25

 

The removal of ceilings in every room: 53,46 m2 x 45 = 2405

1 m2 = 45

 

Pattern of extenison dol :

Rear Extension ; 3980 x 4260 = (16,95 m2 x 11) x 115 = 21, 441

Extension Side ; 1350 2820 = (3,81 m2 x 11 ) x 115 = 4,819

115 za st 2

SIDE AND REAR EXTENSION

DEMOLITION SIDE EXTENSION

Carefully remove existing roof structure and beams if needed

Carefully remove brick work

Remove all windows and glass.

Remove doors.

Bag all debris and move to kerbside for pickup.

Removal (skip) costs paid by customer.

DEMOLITION (REAR EXTENSION)

Carefully remove existing roof structure and beams if needed

Remove all windows and glass.

Remove doors.

Bag all debris and move to kerbside for pickup.

Removal (skip) costs paid by customer.

FOUNDATIONS:

(SIDE EXTENSION)

Carefully excavate existing concrete foundations.

Bag debris and move to kerbside for pickup.

Removal (skip) costs paid by customer.

Inspect existing ground.

As needed, dig out earth to 1,2 m depth and 600mm wide as per Regulations.

Arrange for inspection by Building Control.

After approval, pour new concrete foundations.

FOUNDATIONS:

(REAR EXTENSION)

Carefully remove any existing paving/concrete)

Bag debris and move to kerbside for pickup.

Removal (skip) costs paid by customer.

Inspect existing ground.

As needed, dig out earth to 1, 2 m depth and 600mm wide as per Regulations.

Arrange for inspection by Building Control.

After approval, pour new concrete foundations.

BUILD SIDE AND REAR EXTENSION:

Install New Masonry(As Discussed / Per Plans – drawings)

INTERIOR/EXTERIOR CAVITY WALLS

Lay out face brick course as per plans on all exterior walls with SMEAD DEAN bricks
Lay out block courses as per plans on all interior walls with light weight blocks

WALL TIES
Install wall ties as directed.In order to comply with the requirements of the
Build­ing Regulations (1985) the tieswill be installed and spaced as follows: 600mm horizontal spacing and 450mm vertical spacing to provide a density of 3.7 ties/m2. (or per plans)

INSULATION
Install insulation as directed. Wall to be insulated with 50mm Wallmate insulation or similar (per plans)Insulation to be installed horizontally starting at the sill plate. We will ensure that there are no cold bridges at junctions and openings.(No stapling is required because the batts fit tightly between brick skin and blocks.)

AIR VENTS / WEEP HOLES
Air vents (air bricks) to be installed per plans.
Weep holes to be installed per plans (if required)


DOORS AND WINDOWS

Make openings for doors and windows per plans. Install lintels for door openings and windows per plans (Does not include steel beams). It will be useful when laying out window and door openings if you can fashion a wood template or similar. We will request that customer sign off on window and door openings as they are completed.

INTERIOR CARPENTRY AND ROOFING: SIDE EXTENSION

FLOORING

Ground floor:

Install TYPE1 MOD harcore in floor base (50mm).

Hard back using wacker plate.

Install sand base.

Install waterproof floor membrane and lap into walls as per plans.

Arrange for building control inspection.

Pour concrete screed and install floor installation and final concrete as per plans.

First floor:

Install 6 x 6 (or other) joists set at 350mm to form new floor space

Install new plywood floor over joists

ROOFING:

Install wood beam at edge of new roof

Install new 6 x 6 (or other) joists set at 350mm to form new roof
(make opening for toilet waste stack)

Cover roof and install insulation per plans

Install roof covering

Install new lead flashing incorporated into brick walls (if requied)

Install gutter and downspout

INTERIOR CARPENTRY AND ROOFING: GARDEN EXTENSION

FLOORING

Ground floor:

Install TYPE1 MOD harcore in floor base (50mm).

Hard back using wacker plate.

Install sand base.

Install waterproof floor membrane and lap into walls as per plans.

Arrange for building control inspection.

Pour concrete screed and install floor installation and final concrete as per plans.

ROOF TERRACE:

Install 6 x 6 (or other) joists set at 350mm to form new roof terrace space

Install new plywood floor over joists to form new roof floor

Install roof insulation and underlay

Install new roof (description by customer).

STEEL BEAMS:

We are able to provide the labour for the installation of new rsj beams. However, we need to discuss this with the client and the costs for this are not included at this time.

Renovating a House

Bedroom 1

Knocking down the fireplace Placing the timber to hold the chimnie

Store Room 1

Build Mdf wardrobe – This job will be completed  according to client’s specification

Corridor

 

Bathroom

Knocking down the fireplace Placing the timber to hold the chimnie

Remove walls tiles
Prepare interior walls for new tiling

Install new wall tiles

Remove  lino floor
Prepare interior floor for new tiling

Install new floor tiles

Replace sink

Replace bath

Replace bathtub

Fix and paint box on the pipes

Install tub and sink faucets

Replace shower with pomp.

Fix  ventilator

Clean grout tiles ( special chemicals)

Create a bigger NEW larger bathroom from a bathroom and toilet by knocking down the wall separating them.

Installing ceiling spotlights in the new kitchen.

 

Store Room 2 – TBC

…………………………………………………

…………………………………………………

………………………………………………….

Bedroom 2

Make opiening to acces for side extenison

…………………………………………………

…………………………………………………

Kitchen

To install ……. double wall cabinets an ….. single wall cabinets.

To install ……. double floor cabinets an ….. single floor cabinets.

Install new cooker and Traditional Cooker Hood

Fix new tiles on the top worktop.

Connect Boiler, washing-machine, frig.

To fit a wood box for the boiler.

Inspect all plumbing + CORGI certificate

Install new appliances

Install fan

Install new appliances

Tear out existing fittings and floor

Inspect all floors and fix as needed

To create a vent hall and install ventilation.

Rear Extension

…………………………………………………

…………………………………………………

………………………………………………….

Electricity

Bedroom 1

– 3no double sockets

– 1 no down light

– 1no tv socket

– 1no telephone socket

Store Room 1

– 1 no double socket for combi boiler

– 1 no down light

Corridor

– 3 no double socket

– 4 no down light

Bathroom

– 1 no down light

– 1 no shaver socket with light

– 1 no extraction fan

Store Room 2

– 1 no double socket for combi boiler

– 1 no down light

Kitchen

– 3no double sockets

– 1 no down light

– 1 no cooker circuit 4kW

– 1 no extraction fan

– 6 spotlights

Bedroom 2

– 3no double sockets

– 1 no down light

– 1no tv socket

  • 1no telephone socket

Rear Extension

– 2 no double sockets

– 1 no down light

Price based on assumption :

– standard switched white double sockets

– standard white single pole switches for all lights( no dimmers, except toilet and bathroom where pull cord switches)

– standard luminaries (no halogen)

– standard wired door bell

Plumbing

Preparation jobs:

– Removing old boiler

– Removing old main tanker

– Removing old boiler tanker

– Removing old gas installation for 4 no chimneys

– Removing old central heating installation and  8 no radiators

– Removing  bath, sink, old toilet from bath

– Removing sink, washing machine from kitchen

Installation jobs

– installation combi boiler and fume pipe

– installation 8no radiators

– installation central heating pipes

– cold and hot water pipe work

– drainage installation for kitchen, bathroom and toilet

– programmer for boiler

– gas installation for combi boiler and cooker

– installation bath, basin and toilet

+  CORGI  certificate

Floors

Replace ceiling

To remove ceiling , and to replace with plasterboards.

Inspect all joists.

To remove coving

To remove all ceiling plasters

To dispose of all plasters removed

To do one coat of skimming plaster

To make good where necessary

We will ensure that all areas are covered and dust free during this operation

Remove rubbish.

Complete Clean-up

Floors : TBC

Laminate all floors with felt and corners.

Skirting/architrade/ Doors

Install wood skirting throughout.
Install wood architrade (moulding) on both sides of  new doors.

Install new doors or inspection old doors and painitng
Install hunges, door handles, and door locks on  doors.

Painting

Complete all plastering/skimming as needed

Wall and ceiling  inspection

Wallpaper removal if needed

Repair wall, ceiling  (fill cracks) if needed

Painting  walls and  ceiling

Application of 3 coats of white emulsion (or other colour) on walls and ceilings

Paint radiators and pipes with radiators paint

Painting Woodwork:

Repair wood trim on doors and doors if needed

Painting skirting

Scrape, fill and sand if needed

Application of 2 undercoats and 2 finishing coats (gloss or satin)

 

 

 

 